This new 20,000 square foot data center was constructed within an existing 34,560 square foot building. The new facility was designed as a tier III and includes 450 kW load, 3,500 square foot raised floor area, infrastructure support space, and IT staff space. The design adheres to lean principles and features a fully roofed wind and water-resistant shell within the existing structure to provide a hardened facility, exterior emergency generators and chillers with screen wall, and compartmentalized spaces for electrical service entrances, uninterruptable power systems (UPS), battery rooms, and power distribution. 

- Well-executed project plans resulted in a 10% cost savings
- Project completed one month early
- Delivered in a truly collaborative design-build process 

GET IN TOUCH

Scott Ganske Director of Operations - Mission Critical Email | 763.287.5147