Mortenson was selected by Citizens Energy to design and construct Chicopee Solar facility, located in Chicopee, MA and the Rehoboth Solar facility located in Rehoboth, MA.  Mortenson was contracted to provide full engineering, procurement and construction (EPC) services for the facilities and used a fixed-tilt racking solution to support approximately 21,330 PV modules.  The Chicopee Solar facility interconnects with Chicopee Electric Light (CEL) and Rehoboth Solar facility interconnects with the National Grid.  The two projects generate renewable electricity for nearly 3,300 households.

 