Water / Wastewater

team results

The City of Bend selected Mortenson to install 10 miles of 30” pipeline that carry water from Bridge Creek through the National Forest and a local neighborhood to Bend’s water chlorination facility. This pipeline will replace two lines originally installed in the 1920s and 1950s, that are fragile and in poor repair. The pipeline is a combination of HDPE and mortar lined / coated steel. 

GET IN TOUCH

Tom Paul Tom Paul General Manager, Environmental Email | 425.449.6994