The project consists of paving over 225,000 square feet of facility access roads and parking lots, improving storm drainage systems, providing and installing filter plant and pump station indoor lighting, installing over 3,000 lf of fiber optic backbone, installing cathodic protection systems, repairing large concrete channels and basins, removing process drain systems, and installing pump systems. 