Aircraft Maintenance Hangars P522 P524 / NAS NorfolkVA
This project involved the construction of two single-bay aircraft hangars. Construction features included reinforced concrete pile foundation systems, structural steel frames, clear span trusses across hangar openings, reinforced concrete floors, CMU walls, built-up roofIng, fabric hangar doors, AFFF fire suppression system, overhead bridge cranes, 400Hz power, compressed air systems, conventional HVAC systems, electrical and communication services, and vertical lift fabric hangar doors. The project also involved the development of administrative spaces and new site utilities and improvements, including over 198,000 SF of aircraft parking apron, POV parking lot, and demolition of several existing hangars.

Facts And Figures

NAVFAC Mid-Atlantic

Completed August 2003

$21,884,546

128,425 SF (total project)

Delivery Methods

General Contractor