LOSD Westridge Elementary Renovation / Lake OswegoOR
What does a safe and student-friendly elementary school renovation look like?

The Lake Oswego School District Westridge Elementary School renovation project consisted of a major remodel, which occurred in a compressed schedule in the summer of 2019, between calendar school years. Westridge Elementary School is a one-story 46,324 square foot building with a mechanical mezzanine and a 4,626 square foot attached covered play area constructed in 1980. The Westridge Elementary School renovation project included deferred maintenance, safety, and seismic upgrades, accessibility updates, plumbing renovations to meet code requirements, and repaving of the existing main parking area. Other maintenance items included repairs and replacement of damaged or failing envelope materials, mechanical repairs, and replacement of the existing wood-framed entry canopy with a new fire-retardant canopy. Renovations include the removal of unbraced walls and seismically unbraced library loft, to be replaced with new reading rooms, as well as the renovation of a classroom area into a school resource maker space. A one-classroom addition was also incorporated into the project to maintain the current classroom capacity.

Facts And Figures

Construction begins: Q2 2019 Construction Cost: $10.7 million 46,000 square feet

Completion Date: Q3 2019 Lake Oswego School District

Delivery Methods

Construction Manager General Contractor

The Team