Microsoft Studios West Campus
Microsoft Studios West Campus Development / RedmondWA
What does the future of tech look like?

Mortenson constructed Microsoft’s 550,000 SF West Campus Development. This development includes the construction of two office buildings, in addition to new intersections, roads, and utilities. The scope of these projects includes developer space, general offices, cafeterias, conference spaces, collaboration areas and general circulation and support spaces. Studio B was built to LEED® Silver standards, and Studio A qualifies for, although did not seek, LEED Silver Certification.

- Largest contiguous corporate campus in the world.
- Design and build two buildings totaling 550,000 SF; 20-month construction duration
- Highly functional, interactive buildings and site layout that ultimately increased team member productivity
- LEED Silver Certification; features include use of daylighting, underfloor air and power distribution, an internal bicycle repair shop for employees, mass transit and other alternative transportation accommodations, interconnectivity with the surrounding community, water use reduction strategies, and enhanced commissioning

Facts And Figures

Microsoft Corporation

Completed May 2009

Cost Confidential

555,000 square feet

Delivery Methods

Construction Manager at Risk