Wind

team results

The 150 MW Shiloh I consists of 100 GE 1.5 MW wind turbine generators on 65-meter (24) and 80-meter (76) towers.  Mortenson’s scope of work included constructing 25 miles of access roads, 100 turbine foundations, erection of 100 wind turbines, installation of 45 miles of 34.5kV underground collection system and 3 meteorological towers.