Completed construction of medical clinic
SCL Health Clinics Buildout / Denver Metro AreaCO
Can hospital construction be done to set up the site for future growth?

Mortenson was selected as the Construction Manager to build out three SCL clinics: Cherry Creek Clinic, Denver West Clinic, and Superior Clinic. All three projects started in January of 2019 and were completed between May and June of 2019. The team worked through several owners and design changes as the customer updated its standards for building future clinics around the Denver Metro area. Mortenson self-performed Acoustic Ceiling Tile (ACT) and drywall, and installed the feature patient room ExamSlide™ barn doors (with glass artwork in the center), with excellent quality and safety.

Cherry Creek Clinic - $1.6 Million

Mortenson demolished and built-out the top floor of an office building for a 9,000-square-foot family medicine clinic relocation. The space features new patient rooms, care team areas, physician consultation spaces, a blood lab, and a procedure room. Mortenson self-performed the backing, toilet accessories, and doors, frames, and hardware.

Denver West Clinic - $2 Million

Mortenson demolished and built-out a floor at the Denver West Campus for an 11,000-square-foot family medicine clinic relocation. The space includes new patient rooms, care team areas, physician consultation spaces, a blood lab, and procedure rooms. Mortenson self-performed the ACT ceiling, drywall, framing and finishes, backing, toilet accessories, and doors, frames, and hardware.

Superior Clinic - $3 Million

Mortenson demolished and built-out a new 15,000-square-foot family medicine, primary care, and OBGYN clinic in downtown Superior. The space includes new patient rooms, care team areas, physician consultation spaces, a blood lab, procedure rooms, ultrasound and stress test rooms. Mortenson self-performed the ACT ceiling, backing, toilet accessories, and doors, frames, and hardware.

Facts And Figures

SCL Health

$6.6 Million Total

Cherry Creek: 9,000 square feet

Denver West: 11,000 square feet

Superior: 15,000 square feet

Completion: May/June 2019

Delivery Methods

CM at Risk

The Team