Misae Solar I Energy Construction Project / Childress, TX
What does saving 440,000 tons of CO 2emissions from entering the atmosphere look like?
Mortenson Builds Ninth Solar Project in Texas
The 326 MWdc Misae Solar I project, located in Childress, Texas, was Mortenson's ninth solar project in the state. It is expected to generate enough clean energy to power nearly 60,000 houses per year.
Strong coordination and collaboration proved to be key to successful schedule execution on this project. The continuous interface between our Power Delivery team and the Transmission Service Provider and Utility offtaker allowed us to execute the necessary upgrades required to meet the solar project schedule. Familiarity with ERCOT processes and dedication to strong communication from start to finish were the differentiating factors.
Facts And Figures
Completed December 2019
326.9 MWdc
Single-Axis Tracking
326.9 MWdc
Single-Axis Tracking
Delivery Methods
Engineer, Procure and Construct