Building Solar in the Sunshine State
The 328.9 MWdc Mount Signal 3 Solar project, located in Calexico, CA, spans across 1,934 acres of relatively flat terrain and contains more than 2,744,880 modules.
The electrical scope for the project included a 230kV substation, 34.5kV collection system, and a 230kV connection to the existing Mountain Signal 1 substation.
- Delivery Method
-
Engineer, Procure and Construct
- Additional Project Facts
-
Completion Date: November 2018 328.9 MWdc Single-Axis Tracking