In 2010, the fully operational building was expanded to add 55,000 GSF of building in two modules. This expansion was of particular significance to the customer as it required the expansion and integration of fully operating data center systems. This was accomplished through the intensive execution of a detailed Method of Procedure (MOPS) to ensure uninterrupted operating of the existing facility. The project was completed with zero operational downtime or incidents.
- Delivery Method
-
Guaranteed Maximum Price
- Additional Project Facts
-
Fortune 500 Company
Completion Date: December 2011
55,000 GSF Raised Floor
Tier II
3.0 MW Critical Load