Modernizing Campus Infrastructure
New underground distribution lines connected the renovated central plant with Blanchard Hall, the Memorial Student Center, and other facilities, while building-level mechanical upgrades improved system responsiveness. Fan-powered variable air volume units now help connected HVAC systems adjust to changing occupancy, weather conditions, and solar exposure, advancing the college’s broader campus modernization initiative.
Delivering Innovation Beneath the Surface
A key component of the project was the implementation of high-density polyethylene (HDPE) fused piping systems. Unlike traditional jointed piping, HDPE fusion technology creates continuous pipe runs with leak-resistant connections that provide enhanced durability, corrosion resistance, and long-term reliability.
The project team used 3D building information modeling (BIM) to coordinate complex utility routes before installation. The shared digital model gave project stakeholders and field personnel a clearer view of spatial constraints, improved communication, and helped teams plan work in challenging existing conditions.
During excavation activities near the Memorial Student Center, several undocumented underground utilities, including duct banks, water lines, and sewer infrastructure, were discovered. Working closely with Wheaton College and Salas O’Brien, the team verified field conditions, adjusted utility routing, and maintained project progress while minimizing impacts to schedule and campus operations.
Maintaining Campus Operations While Building for the Future
Construction on the fully occupied campus required careful coordination around summer classes, youth programs, special events, exams, and daily activities to maintain safe access and minimize academic disruption.
Clearly marked pedestrian routes, temporary wayfinding, construction barriers, and ongoing coordination with college leadership supported the campus community. The team adjusted work around major events and academic milestones.
The improvements allow Wheaton College to isolate utility zones for maintenance or repairs without broader service shutdowns. More responsive building systems and durable HDPE piping strengthen daily reliability and support future campus modernization.