Case Study: OSF St. Francis Medical Center EC2 Project

Our customer needed an accurate Revit MEP as-built model of their 60,000-square-foot energy plant for the design team.

The deliverable would also be used for facility upgrades, adaptive re-uses, and avoiding field re-work.

Using Mortenson’s full in-house capabilities, we scanned the entire facility, inside and out, to create an accurate 3D model complete with architectural, structural, and MEP systems.

This allowed the architect/engineer to deliver a better design and reduce exploratory time and field visits while minimizing field clashes and disruption – ultimately improving efficiency.

“The accuracy of their model was very good and the installation went well and without issue. Being able to take sections and drawings into the field that represent actual conditions greatly improves the efficiency and accuracy of the field take off effort. Mortenson’s efforts as part of the design and construction team saved our project time, hassle, and money. The end result was a successful project with a highly accurate 3D as-built model.”

Richard A. Vedvik
Acoustical Engineer
KJWW Engineering Consultants
OSF St. Francis Medical Center Energy Center Upgrades Phase II