Skip Navigation

Wind Millwright - Wellsburg Repower Wind Project

Wellsburg, IA, United States | Wind Energy Group
 

Project Name: Wellsburg Repower Wind Project 
Project Location: 3348 130th St, Wellsburg, IA 50680

 

As Millwright, your primary duties include dismantling, erecting, assembling, aligning, adjusting, and/or maintaining machinery and equipment according to installation manuals, work instructions, layout plans, blueprints, and other drawings.

 

 

RESPONSIBILITIES

Receiving and offloading all major components

Installing loose components for Nacelle, hub, and tower preparation

Connecting blades to hub

Setting base and tower sections

Managing taglines

Involved with main erection crane assembly and teardown

Climbing ladders – average 80m

Drilling and/or tapping of all holes on turbines, generators, compressors, and pumps

Torqueing/tensioning any bolted connection

 

QUALIFICATIONS

Ability to read and interpret documents such as safety regulations, assembly/disassembly, operation and maintenance instructions, and procedure manuals

Strong teamwork orientation

Positive attitude and professional customer service skills

Detail oriented

 

 

Education and Experience Requirements

High School Diploma or GED

1 year of related experience preferred

Must possess valid driver’s license of proper class and necessary endorsements as required by law

 

Mortenson is an EOE/Affirmative Action/M/F/Veteran/Disabled employer.

Mortenson by the numbers

$6.7B

2024 revenue

12

regional offices across the US

7,200+

team members

35

best workplace awards (last 5 years)

Returning candidate? Log back in.

Not the right fit? Join our Talent Community to connect with us.

Mortenson EEO Policy - English Spanish

Know Your Rights - English | Spanish

Supplement for Federal Contractors - English | Spanish