Construction of the Froedtert & the Medical College of Wisconsin’s 610,000 SF, eight-story Center for Advanced Care was completed in October 2015. Its name reflects the exceptional level of specialty care and medical technologies that are housed there, including the Heart and Vascular Center, Transplant Center, and integrated rooms for surgeries and interventional procedures.
More than 18,000 surgeries, including over 250 transplants, are performed at Froedtert Hospital each year. The new building brings together surgical, interventional, and intensive care areas on a single, centrally located floor. Their proximity to each other helps eliminate redundancy, enhance patient flow and safety, optimize operational efficiency, and support new technology adoption. Few hospitals in the nation have created this integrated environment.
- Completion Date
December 2015
- Delivery Method
-
Construction Manager
- Additional Project Facts
-
Froedtert & the Medical College of Wisconsin
$139,000,000
610,000 Square Feet
Awards
-
Best Project Award, 2020
-
Top Project Award, 2020
-
Best in Show (from Top Projects), 2015
-
Top Project Award, 2015
-
Best New Development or Renovation, 2016
-
Concrete Design Award, 2015
-
Technology in Architectural Practice (TAP) Award, 2016
-
Showcase Award, 2016
-