Lutheran Medical Center Small Projects / Wheat Ridge, CO
Since 2015, Mortenson has been working with SCL Health as the integrated, on-site general contractor at Lutheran Medical Center in Wheat Ridge.
To date, the project scope includes:
- Switchgear Upgrades
- EP Lab Equipment Upgrade
- CT Sim Equipment Upgrade CT 6 Equipment Upgrade
- OR Integration
- Site Security Poles
- Retail Pharmacy
- TSN Office
- CUP Infrastructure Upgrades
- NUC Med Camera Equipment
- Hail Damage Emergency Repairs
- 8-inch Fire Main Repair
- IR Equipment Replacement
- Data Center MPOP/CPOP Renovation
- Pharmacy Automation
- Pharmacy Infusion Center
- RF Imaging
- Cath Lab 3
- Linear Accelerator
- West Pines Boiler Replacement
- Emergency Department X-Ray
- Transformer & Fire Pump Replacement
- DAS Upgrade
- Central Utility Plant Renovations
Facts And Figures
$36,500,000 to date
Delivery Methods
Construction - General Contractor