Kirkland, WA

EvergreenHealth 2-Silver Surgery Expansion

Expanding surgical and cardiac capacity while keeping every patient service online.

Project Overview

EvergreenHealth is expanding surgical, cardiac and endoscopy capacity at its Kirkland, Washington campus through a $115 million, 95,000-square-foot hospital improvement project. Delivered in partnership with NBBJ, the project adds new procedural spaces, modernizes existing clinical areas and maintains uninterrupted patient care throughout construction.

Key Takeaways:

  • Expanded Surgical and Specialty Care Capacity: Adds seven operating rooms, six catheterization labs, one hybrid operating room and five endoscopy procedure rooms.
  • Construction Within an Active Hospital: Phased construction maintains patient services while new clinical spaces are integrated into the campus.
  • Complex Renovation and Build-Out: Combines a 73,000-square-foot shell space build-out with renovations to existing surgical and endoscopy areas.
  • Clinician-Led Design Validation: Mixed reality and physical mock-ups allowed care teams to refine room layouts before construction.
  • Collaborative Risk Management: EvergreenHealth, Mortenson and NBBJ coordinate logistics, infection prevention, procurement and constructability planning.
Estimated Completion Date

September 2027

Project Cost

$115,000,000

Delivery Method

General Contractor/Construction Manager

Related

Healthcare

Seattle

Expanding Capacity for Surgical, Cardiac and Endoscopy Services

EvergreenHealth is expanding surgical, cardiac and endoscopy services at its Kirkland campus to meet growing demand and improve access to specialized care. In partnership with EvergreenHealth and NBBJ, Mortenson is delivering the $115 million project, with completion anticipated in September 2027. 

The project brings together three major areas of work:

  • Building out approximately 73,000 square feet of existing shell space for a new surgical suite
  • Modernizing approximately 5,000 square feet of existing C-section operating rooms
  • Renovating approximately 15,000 square feet for new endoscopy procedural suites 

The new surgical suite includes seven operating rooms, six catheterization labs, one hybrid operating room and associated preparation, recovery and support spaces. Existing C-section operating rooms are being modernized to meet current codes and clinical best practices, including the installation of new rooftop mechanical infrastructure. The endoscopy renovation adds five procedure rooms alongside preparation, recovery, scope-processing and support areas.

Maintaining Patient Care During Construction

Because construction is taking place within an occupied healthcare environment, uninterrupted patient care remains a central project priority. The team is coordinating sequencing, logistics, infection prevention measures and system connections to safely integrate new clinical spaces while minimizing disruption to hospital operations.

Mortenson is collaborating with EvergreenHealth and NBBJ to support:

  • Cost control and schedule adherence
  • Constructability planning
  • Early procurement
  • Stakeholder alignment
  • Safe hospital operations
  • Integration with existing infrastructure

Through proactive planning and collaboration, the team is managing project risk while helping ensure patients, caregivers and staff continue to receive the care and services they depend on throughout construction.

Using Mixed Reality to Improve Early Decision-making

To help finalize space planning for 14 operating rooms, the project team combined physical mock-ups with mixed reality technology. Nurses and physicians experienced the proposed spaces at full scale before construction, evaluating workflows, equipment placement, lighting, monitors and room functionality.

Approximately 20 to 25 EvergreenHealth stakeholders participated in the immersive reviews. Their feedback helped the team adjust equipment locations, validate clinical workflows and remove unnecessary elements before construction began. Resolving these details early provided greater certainty and confidence moving into production while helping ensure the final spaces support the needs of the clinicians who will use them every day.

By working collaboratively and proactively as one team, we're expanding access to care and delivering meaningful benefits for our community.
Garett Buckingham, Director of Design & Construction, EvergreenHealth
Garett Buckingham Director of Design & Construction, EvergreenHealth